![]() |
![]() |
|
|
|
![]() |
copyright © 2003 T.Y.Lin Taiwan Consulting Engineers, Inc.
กด Selected Projects For MRT
|
Project Name |
Client |
Project Outline |
|
Taipei Mass Rapid Transit System Tamshui Line Design Viaduct |
Department of Rapid Transit System, Taipei City Government |
Viaducts and station detail design on MRT system with total length of 10.8 km. Viaducts supported by single piers seismic resisting with ductile design. Station area structures were supported on ductile bent columns. |
|
Taipei Medium Capacity Transit System Mucha Line |
Department of Rapid Transit System, Taipei City Government |
Detail design of viaducts tunnel and station with total length of 11.6 km. for this first rubber wheeled automated mass transit system in Taiwan. |
|
Taipei Mass Rapid Transit System Hsin Chung Line Project Design Lot: DK195 |
Department of Rapid Transit System, Taipei City Government |
Total length of 4.13 km. underground rapid transit system including 3 underground cut and cover stations, Hsin Chuang (02), Tou-Chien-Chuang (03), Hsiem-Seh-Kang (04), and the interconnected in between station with 2 single track shielded tunnel structures. |
|
Taipei Mass Rapid Transit System Nangang Eastward Extension Line Design Lot:DE 200 |
Department of Rapid Transit System, Taipei City Government |
Project starts from east side of Kunyang (BL16) station with total length 2.4km eastward, include 950m 2-single track shielded tunnels, 154m cut and cover crossover tunnel, 223m long Nangang (BL17) station 142m cut and cover tunnel, then connected to 685m co-structure tunnel built by Taipei Railway Nangang undergrand project, then 39m pipe roof tunnel and 196m long Nangang Business Park S. (BL18) station. |
|
Preliminary Planning for the Loop Line of Taipei MRT System with Private Participation Policy BOT Model |
Bureau of Transportation, Taipei County Government |
Planning for loop line for Great Taipei Area, from Mucha Zoo to Neihu and connecting 11 MRT lines. The project consists of 34.5 km. and 31 stations. |