Home

ABOUT USSERVICEPROJECTSCAREERCONTACT

copyright © 2003 T.Y.Lin Taiwan Consulting Engineers, Inc.

กด Selected Projects For Hydraulic/Soil Conservation

Project Name

Client

Project Outline

Soil-water Conservation Planning in Lan Yang Campus, Tamkang University

Tamkang University

Area sewerage system is divided into north end and south end two collection system with its south sewerage system of initial development, sewage treatment plant is located in Hou-Ching River riverside with sewage treatment capacity of 46,087 CMD average.

Storm Water Pumping Stations at Fusan Park etc., Daken Creek, Taipei City

Dept.of Maintenance Engineering, Taipei City Government

Among the four storm water pumping stations, each of the design flows in Fusan Park station, Shifen Creek left bank and right bank stations is 3cms, while that in Chinli Bridge station is 7.5cms.  Every pumping station is equipped with regulation basin, bar screens, pumps and gen-sets.

 

Bridge/Highway/Railway 
MRT 
Building Structures 
New Town 
Construction Supervision 
Construction Management 
Inspection/Retrofit 
Environmental 
Hydraulic/Soil Conserv.